Projects

+ Barge Facilities
+ Berthing Structures
+ Bulk Loading Terminals
+ Cruise Ship Terminals
+ Ferry Terminals
+ Fish Farms
+ Fishing Harbours
+ Floatplane Terminals
+ Forest Product Terminals
+ Grain Terminals

+ Harbour Planning
+ Highway Bridges
+ Inspection of Marine Facilities
+ Marinas
+ Ship Handling Facilities
+ Shipyards
+ Supply Ports

+ Tanker Terminals
+ Trestle Structures
+ Wharf Structures

 

 

Marine & Transportation

Tip: Click for more information about a project

Ferry Terminals

BC Ferry Corporation: Horseshoe Bay & Nanaimo

Conceptual design of marine facilities for fast ferry operation, including loading ramps and berthing structures. Horseshoe Bay and Nanaimo, BC (1994-1995)

BC Ferry Corporation: Tsawwassen

Planning, detailed design, and construction supervision of new ramp at Berth #2. Tsawwassen, BC (2003-2005)

ViewDevelopment, detailed design, and construction supervision of restaurant and foot passenger buildings. Tsawwassen, BC (1995)

Planning and conceptual design of the Tsawwassen Terminal Phase II development including marine facilities, civil facilities, and infrastructure. Tsawwassen, BC (1994-1995)

Planning and design of new fender system for the N30 turning dolphin in Berth No. 5. Tsawwassen, BC (1994)

Design, contract preparation, and construction supervision of upgrading of berthing structures in Berth No. 5. Tsawwassen, BC (1992-1993)

ViewComplete design, from concept to installation, and commissioning of new automatic ferry ramp system for BC Ferry Corporation's new ferry class. Berth No. 5. Tsawwassen, BC (1989-1991)

BC Ferry Corporation: Swartz Bay

ViewDevelopment, detailed design, and construction supervision of new ferry terminal berth, including new automatic ferry ramp system. Berth No. 1. Swartz Bay, BC (1991-1992)

Upgrading and replacement of ferry ramp with new double deck structure. Berth No. 3. Swartz Bay, BC (1990-1991)

BC Ferry Corporation: Horseshoe Bay

ViewDevelopment, detailed design, and construction supervision of new automated passenger loading ramp. Horseshoe Bay, BC (1995-1996)

Development, detailed design, and construction supervision of new multi-apron ferry ramps equipped with primary and secondary aprons designed to ensure smooth transition from land to ramp and from ramp to ferry. Berth Nos. 1, 2, and 3. Horseshoe Bay, BC (1988-1990)

Structural evaluation and cost estimate of repair of damaged ramps at Berth No. 2; insurance assessment. Horseshoe Bay, BC (1989)

Study and preliminary design of modifications to hydraulic hoisting system. Horseshoe Bay, BC (1989)

Computer analysis and structural evaluation of load-carrying capacity of lower ramps. Horseshoe Bay, BC (1988)

BC Ferry Corporation: Langdale

Structural evaluation and cost estimate of repair of damaged ramp, Berth No. 2; insurance assessment. Langdale, BC (1989)

BC Ferry Corporation: Westview

Structural evaluation of existing timber access trestle. Westview, BC (1988)

BC Ferry Corporation: Snug Cove

Planning and design of holding area. Snug Cove, BC (1986)

BC Ferry Corporation: Deas Dock

Inspection of four service ramps and design of modifications to ramp supports and hoisting systems. Richmond, BC (1987)

Construction supervision of steel sheet pile retaining wall. Richmond, BC (1987)

 

| Company | Clients | Projects | Downloads | Contact Us | Search | Site Map |

© 2009 Villholth Jensen & Associates Ltd. All Rights Reserved
Last Updated: June 2009

This site is maintained by Karin Jensen